NEWPORT BEACH DEVELOPMENT

Newport Beach development tracker

This page tracks commercial and mixed-use projects, public infrastructure and the city plans in Newport Beach that have a public record: what each one proposes, its status as the source states it, and the dated events behind that status. Last checked October 13, 2026. It records what the sources say and does not predict what a project will become.

Which Newport Beach projects are under construction?

None of the sources read for this tracker states that a project is under construction.

Which Newport Beach projects have an approval on record?

1 project below. Each shows the status words and dates from its sources, with dates written out in full.

Newport Irvine Medical Center (3300 Irvine Avenue)

  • Location: 3300 Irvine Avenue, just off State Route 73
  • Type: Conversion of a 78,000 square foot office building to a medical outpatient building, with a new parking structure
  • Status: Approved by the Newport Beach Planning Commission, unanimous, January 2025 (January 2025)

Dated events:

  • January 2025: Newport Beach Indy reports the project "received unanimous approval from the Newport Beach Planning Commission in January 2025." Source: Newport Beach Indy, published 2025-04-04.
  • April 9, 2025: Rebusiness Online reported the project had "completion slated for spring 2026 and tenant move-ins in summer 2026." No later source is recorded here, so whether it has opened is not confirmed. Source: Rebusiness Online, published 2025-04-09.

Which Newport Beach projects are filed or in environmental review?

2 projects below. Each shows the status words and dates from its sources, with dates written out in full.

Newport Village Mixed-Use Project (PA2022-0166)

  • Location: North and south sides of West Coast Highway in the Mariner's Mile corridor (approximately 9.4 acres)
  • Type: Mixed-use: 198 dwelling units plus office, retail and restaurant space
  • Size as the source words it: 63,285 square feet of commercial floor area
  • Status: Environmental review: Notice of Preparation of an EIR sent October 12, 2023 (October 12, 2023)

Dated events:

  • October 12, 2023: The City of Newport Beach project page states: "Notice of Preparation of an EIR sent October 12, 2023." Source: City of Newport Beach, undated (page lists activity through Oct 12, 2023).
  • undated: The same page lists a Coastal Development Permit "to allow development in the Coastal Zone." It lists the public draft EIR as anticipated for Spring/Summer 2024 and a Planning Commission meeting as "Late 2024". Both are the page's own estimates, and the page posts no later activity. Source: City of Newport Beach, undated (page lists activity through Oct 12, 2023).

Bayside Village Marina - Back Bay Landing Bayfront Stabilization and Improvement Project (PA2024-0135)

  • Location: Immediately north of East Coast Highway, within the Bayside Village Marina and Back Bay Landing areas
  • Type: Seawall replacement and extension, marina dock and slip extensions, and public access easements; includes a Planned Community Development Plan amendment
  • Size as the source words it: an additional 67 wet slips
  • Status: Environmental review: Notice of Preparation comment period October 17, 2025, to November 17, 2025 (October 17, 2025)

Dated events:

  • July 18, 2024: The City of Newport Beach project page states: "Application submitted by Applicant on July 18, 2024." Source: City of Newport Beach, published 2025-10.
  • October 17, 2025: The city page lists the "Notice of Preparation (NOP) Comment Period: October 17, 2025, to November 17, 2025." Source: City of Newport Beach, published 2025-10.

Which Newport Beach projects are proposed or at the study stage?

2 projects below. Each shows the status words and dates from its sources, with dates written out in full.

Balboa Yacht Basin Redevelopment

  • Location: 829 Harbor Island Drive
  • Type: Redevelopment of the yacht basin's landside amenities: Galley Cafe restaurant, office and storage units, and Myrtle Park
  • Status: City Council directed staff to continue with the project proposed by Burnham-Ward Properties (2024)

Dated events:

  • 2024: The City of Newport Beach page states: "The City Council directed staff to continue with the project proposed by Burnham-Ward Properties." Source: City of Newport Beach, published 2024.
  • 2024: The same page states the site "is located at 829 Harbor Island Drive" and that "construction would begin in approximately 2028." That timing is the city's own estimate as published in 2024. Source: City of Newport Beach, published 2024.

Housing Element Implementation Program (Airport Area, Newport Center overlays)

  • Location: Focus areas named by the source: Airport Area, West Newport Mesa, Dover-Westcliff, Newport Center, Coyote Canyon and Banning Ranch
  • Type: Housing opportunity overlay zoning districts for five of the six focus areas (program EIR)
  • Size as the source words it: a total development capacity of 10,087 housing units
  • Status: Program EIR listed on CEQAnet (State Clearinghouse) (June 27, 2023)

Dated events:

  • June 27, 2023: CEQAnet (State Clearinghouse) lists the program EIR with the text "for a total development capacity of 10,087 housing units." Source: CEQAnet (State Clearinghouse), published 2023-06-27.

Which Newport Beach projects have sources that disagree on status?

1 project below. Each shows the status words and dates from its sources, with dates written out in full.

Snug Harbor Surf Park

  • Location: Irvine Avenue and Mesa Drive, Newport Beach (15.38-acre project site)
  • Type: Surf lagoon, amenity clubhouse and athlete accommodation building
  • Size as the source words it: a 5.06-acre surf lagoon with warming pools, a spa, and seating areas
  • Status: Sources conflict: CEQAnet lists a Notice of Determination (October 30, 2025); WavePool Magazine reports a General Plan Amendment was rescinded (January 29, 2026) (January 29, 2026)

Dated events:

  • October 30, 2025: CEQAnet (State Clearinghouse) lists a document of type "NOD - Notice of Determination" received 10/30/2025, with an approval date of 10/28/2025, for a project to "develop a 5.06-acre surf lagoon with warming pools, a spa, and seating areas." Source: CEQAnet (State Clearinghouse), published 2025-10-30.
  • January 29, 2026: WavePool Magazine reports the council "rescinded approval of General Plan Amendment to increase the development limit at Snug Harbor Surf Park from 20,000 square feet to 59,772 square feet." Source: WavePool Magazine, published 2026-01-29.
  • January 29, 2026: WavePool Magazine's headline describes the council backtracking on the surf park buildings, while its updated text says the wave pool approval still stands and only the General Plan Amendment was rescinded. The CEQAnet record does not show the later rescission. Current entitlements are not confirmed here and should be checked with the city. Source: WavePool Magazine, published 2026-01-29.

Which Newport Beach projects have opened or finished?

None of the sources read for this tracker states that a project has opened or been completed. A project would be listed here only if a source says so.

Infrastructure in the works in Newport Beach

7 public works projects are recorded below, each with the agency that lists it, status and the dates its sources give. Cost and funding appear only where a source states them. A budget line or a plan is not a construction start, and several City pages are undated, so those entries say the page was read on October 13, 2026 and do not fill in the months since.

Which infrastructure projects have work under way?

Peninsula Point Encroachment Removal and Dune Restoration

  • Listed by: City of Newport Beach
  • Location: Peninsula Point (the City's update is addressed to Peninsula Point residents and mentions the public beach and street ends)
  • Type: Coastal habitat restoration
  • Status: Year 4 of a 5-year habitat maintenance project, per the City's update of August 10, 2026 (August 10, 2026)

Dated events:

  • August 10, 2026: The City's project page, in an update dated August 10, 2026, states that the City is currently in "Year 4 of our 5-year habitat maintenance project". The update calls the work an "ongoing dune restoration effort". Source: City of Newport Beach, published 2026-08-10.
  • August 10, 2026: The same update refers to "our required 20% native plant cover for California Coastal Commission sign-off next year". Source: City of Newport Beach, published 2026-08-10.

Which infrastructure projects does the City report as having begun dredging?

Lower Newport Bay Federal Channels Dredging 2025-26

  • Listed by: City of Newport Beach project page; dredging by the U.S. Army Corps of Engineers (USACE)
  • Location: Federal Channels of Newport Harbor, from the Entrance Channel up the Main Channel to the Turning Basin at the Newport Boulevard bridge
  • Type: Harbor maintenance dredging
  • Funding as the source states it: The City's project page says the City is "funding a significant portion of the project via a cost-sharing agreement with the federal government" and that "The County will also be contributing funds for the portion of the project within County tidelands"
  • Status: The City's project page (undated, read October 13, 2026) states that USACE began dredging the Federal Channels in early December 2025; the page does not say whether the work is still under way (December 2025)

Dated events:

  • December 2025: The City's project page (undated, read October 13, 2026) states: "The USACE began dredging the Federal Channels in early December 2025." Source: City of Newport Beach, undated (read October 13, 2026).
  • undated: The same page states: "Approximately 900,000 cubic yards of material will be dredged over about 10 months." It does not post a completion date. Source: City of Newport Beach, undated (read October 13, 2026).
  • undated: The same page says the City will "repurpose that dredged sediment unsuitable for open ocean disposal at the Port of Long Beach’s Pier G Slip Fill project". Source: City of Newport Beach, undated (read October 13, 2026).

Which infrastructure projects have an award, permit or approval on record?

Balboa Yacht Basin Maintenance Dredging

  • Listed by: City of Newport Beach
  • Location: Balboa Yacht Basin, 829 Harbor Island Drive
  • Type: Harbor maintenance dredging
  • Status: Contract awarded and regulatory permits secured; dredging scheduled to commence December 3, 2025, per the City's project page (undated, read October 13, 2026) (December 3, 2025)

Dated events:

  • July 3, 2025: CEQAnet (California LCI) lists a filing published 2025-07-03 that states: "The proposed Project includes the maintenance dredging of 4.9 acres of sediment within the Balboa Yacht Basin." Source: CEQAnet (California LCI), Santa Ana RWQCB, published 2025-07-03.
  • undated: The City's project page (undated, read October 13, 2026) states that "the City has secured all regulatory permits, awarded the contract". Source: City of Newport Beach, undated (read October 13, 2026).
  • December 3, 2025: The same page states: "Dredging will commence on December 3, 2025. The project will last approximately eight weeks." The page is undated and posts no later update, so this entry does not say the work started or finished. Source: City of Newport Beach, undated (read October 13, 2026).

Central Balboa Island Underground Utility Assessment District 124

  • Listed by: City of Newport Beach
  • Location: Central Balboa Island
  • Type: Utility undergrounding
  • Status: District approved July 27, 2021; listed as an active assessment district (July 27, 2021)

Dated events:

  • July 27, 2021: The City's assessment district status page (undated, read October 13, 2026) states: "Status: District Approved on July 27, 2021". Source: City of Newport Beach, undated (read October 13, 2026).
  • undated: The same page lists "Active Assessment District #124" and a document titled "AD 124 - Construction Phasing Map, Phase 2,1/7/26". A phasing map is a planning document; the page does not state that construction has started. Source: City of Newport Beach, undated (read October 13, 2026).

Which infrastructure projects are at the planning or study stage?

15th Street Restroom Replacement and Boardwalk Improvements

  • Listed by: City of Newport Beach
  • Location: End of 15th Street
  • Type: Public restroom replacement and boardwalk improvements
  • Status: Planning: restrooms identified as in need of replacement; public meeting held October 17, 2025 (October 17, 2025)

Dated events:

  • undated: The City's project page (undated, read October 13, 2026) states: "The existing public restrooms at the end of 15 th Street have been identified as in need of replacement." Source: City of Newport Beach, undated (read October 13, 2026).
  • October 17, 2025: The same page states: "A public meeting was held to discuss residents wants and needs for the project on October 17, 2025 at Marina Park." The page posts no construction date. Source: City of Newport Beach, undated (read October 13, 2026).

Newport Beach Police Headquarters (new or rebuilt facility)

  • Listed by: City of Newport Beach
  • Location: Options named by the City: Santa Barbara Drive existing site, Dove Street city property, Civic Center campus, Corporate Plaza land near Civic Center
  • Type: Public building (police)
  • Amount as stated: Option costs as the City states them: approximately $167-188M+ (Santa Barbara Drive), approximately $150M+ (Dove Street), approximately $162M+ (Civic Center)
  • Status: Options under evaluation; the City's facility options page states no preferred option has been selected

Dated events:

  • undated: The City's facility options page (undated, read October 13, 2026) states: "No preferred option has been selected, and no final decisions have been made." It gives "Approximately $167-188M+" for Santa Barbara Drive, "Approximately $150M+" for Dove Street and "Approximately $162M+" for the Civic Center campus concept. Source: City of Newport Beach, undated (read October 13, 2026).
  • July 31, 2026: Hoodline, citing the Los Angeles Times, reported on July 31, 2026 that the City Council approved contracts for conceptual design, environmental analysis and strategic communications. The report lists "a $713,080 conceptual-design phase with LPA Inc.", a $346,330 environmental-impact report and up to $315,000 for outreach. It states: "The spending does not approve construction". Source: Hoodline (citing Los Angeles Times), published 2026-07-31.

Which infrastructure projects are recorded as completed?

Newport Bay Trash Interceptor

  • Listed by: City of Newport Beach
  • Location: San Diego Creek just upstream of the Jamboree Road Bridge
  • Type: Trash interceptor that collects and removes floating trash and debris from San Diego Creek
  • Funding as the source states it: Significant grant funding for design and construction was provided by the Ocean Protection Council, Orange County Transportation Authority and Department of Water Resources
  • Completed: Construction completed March 2025, per the City's project page (undated, read October 13, 2026) (March 2025)

Dated events:

  • March 2025: The City's project page (undated, read October 13, 2026) states that the City "has completed the construction of the Newport Bay Trash Interceptor in March 2025". Source: City of Newport Beach, undated (read October 13, 2026).
  • undated: The same page states the interceptor is "located on San Diego Creek just upstream of the Jamboree Road Bridge" and that "Significant grant funding for the design and construction was provided by the Ocean Protection Council, Orange County Transportation Authority, and Department of Water Resources." Source: City of Newport Beach, undated (read October 13, 2026).

City plans: the General Plan, specific plans and housing element

12 plans and plan documents are recorded below with the kind, area, adoption or status date each source gives.

Newport Beach 2050 General Plan

  • Kind: general plan
  • Area as the source states it: City of Newport Beach
  • Adopted: June 23, 2026
  • Status: Adopted by the City Council as a comprehensive update of the 2006 General Plan; the City's page says the online format is being finalized (June 23, 2026)
  • The City's General Plan page states that on June 23, 2026 the City Council adopted the plan, a comprehensive update of the 2006 General Plan adopted on July 25, 2006. Source: City of Newport Beach, undated (read October 13, 2026).
  • Elements listed on the page: Arts and Culture; Circulation; Harbor, Bay, and Beaches; Historical Resources; Housing; Land Use; Natural Resources; Noise; Recreation; Safety. Source: City of Newport Beach, undated (read October 13, 2026).
  • The General Plan page's Land Use Element figure list, which sits under the 2006 General Plan heading, includes Figure LU20 for Balboa Village, Figure LU21 for Newport Center/Fashion Island, Figure LU22 for the Airport Area, Figure LU26 for Mariner's Mile and Figure LU27 for Corona del Mar. Source: City of Newport Beach, undated (read October 13, 2026).
  • The City's update page states that in early January 2019 the City Council initiated a comprehensive review of the General Plan, and later directed staff to focus on the Housing Element, Land Use Element and Circulation Element. Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)); City of Newport Beach (undated (read October 13, 2026)).

2006 General Plan (superseded)

  • Kind: general plan
  • Area as the source states it: City of Newport Beach
  • Adopted: July 25, 2006
  • Status: No longer effective; retained on the City's page for reference
  • The City's General Plan page states the 2006 General Plan is "no longer effective" and is included at the bottom of the page for reference. Source: City of Newport Beach, undated (read October 13, 2026).
  • The City's update page notes that 17 years had passed since the General Plan was comprehensively revised. Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)); City of Newport Beach (undated (read October 13, 2026)).

6th Cycle Housing Element (2022)

  • Kind: housing element
  • Area as the source states it: City of Newport Beach
  • Adopted: September 13, 2022
  • Status: Adopted September 13, 2022; certified by HCD October 5, 2022 (October 5, 2022)
  • The City's General Plan page lists the Housing Element as "Adopted on September 13, 2022, and Certified by HCD on October 5, 2022". Source: City of Newport Beach, undated (read October 13, 2026).
  • The City's update page states that the Regional Housing Needs Assessment (RHNA) allocation required the City to plan for 4,845 new housing units, and that it was "only the 9th in Orange County to become certified". Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)); City of Newport Beach (undated (read October 13, 2026)).

Airport Area Specific Plan (in preparation)

  • Kind: specific plan
  • Area as the source states it: Approximately 360 acres at the northern edge of Newport Beach, adjacent to the airport
  • Status: In preparation. The City's page (undated, read October 13, 2026) says the project is now entering its community visioning phase and invites the public to an upcoming community workshop on August 18th (the page gives no year in that sentence)
  • The City states it "is preparing a Specific Plan to guide the long-term future of the Airport Area". Source: City of Newport Beach, undated (read October 13, 2026).
  • The page describes the district as "primarily a business hub with offices, hotels, limited commercial uses". Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)).

Newport Airport Village Planned Community (PC-60)

  • Kind: specific plan
  • Area as the source states it: West of MacArthur Boulevard, south of Campus Drive, within the Airport Area
  • Adopted: September 22, 2020
  • Status: Adopted by Ordinance No. 2020-22 (September 22, 2020)
  • The planned community text states: "Adopted September 22, 2020". It describes Planning Area 1 as mixed-use residential and Planning Area 2 as non-residential. Source: City of Newport Beach, undated (read October 13, 2026).
  • The City's planned communities index lists it as PC 60 Newport Airport Village. Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)); City of Newport Beach (undated (read October 13, 2026)).

North Newport Center Planned Community (PC-56)

  • Kind: specific plan
  • Area as the source states it: Approximately 171.46 acres along San Joaquin Hills Road and Newport Center Drive, including Fashion Island
  • Adopted: December 18, 2007
  • Status: Latest amendment June 24, 2025 (Ordinance No. 2025-7) (June 24, 2025)
  • The planned community text states it was adopted December 18, 2007 by Ordinance No. 2007-20 and amended June 24, 2025 by Ordinance No. 2025-7 (PA2024-0173). Source: City of Newport Beach, undated (read October 13, 2026).
  • The text describes Fashion Island as the primary retail hub within Newport Center (75 acres). Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)).

Koll Center Newport Planned Community (PC-15)

  • Kind: specific plan
  • Area as the source states it: Approximately 154.0 acres, generally bounded on the northeast by Campus Drive, on the southeast by Jamboree Road and on the west by MacArthur Boulevard
  • Adopted: August 14, 1972
  • Status: Latest listed amendment February 9, 2021 (Ordinance No. 2021-1, Amendment 34) (February 9, 2021)
  • The planned community text states it was adopted by Ordinance No. 1449 on August 14, 1972 and lists Ordinance No. 2021-1 as the latest amendment. Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)).

Santa Ana Heights Specific Plan

  • Kind: specific plan
  • Area as the source states it: Santa Ana Heights, roughly bounded by Upper Newport Bay, Santa Ana Avenue, Bristol Street and the Bayview Terrace area
  • Status: The City states much of Santa Ana Heights has special zoning standards within a Specific Plan; the page gives no adoption date
  • The City's Santa Ana Heights page states: "Much of Santa Ana Heights has special zoning standards within a Specific Plan". Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)).

Mariners' Mile Revitalization Master Plan (shelved) and Strategic Vision and Design Framework

  • Kind: master plan
  • Area as the source states it: Mariners' Mile, a 1.3-mile stretch of West Coast Highway bounded by Dover Drive and Newport Boulevard (per The Log)
  • Status: Draft Master Plan to be shelved for further consideration following the General Plan update (The Log, July 2017); the City's design guidelines page still lists the Mariner's Mile Strategic Vision and Design Framework (July 27, 2017)
  • The Log reported on July 27, 2017 that City staff would "shelve this project and the draft Master Plan for further consideration following the General Plan update". Source: The Log, published 2017-07-27.
  • The City's design guidelines and plans page lists the Mariner's Mile Strategic Vision and Design Framework. Source: City of Newport Beach, undated (read October 13, 2026).

Records: The Log (published 2017-07-27); City of Newport Beach (undated (read October 13, 2026)).

Balboa Village Master Plan and Design Guidelines; Lido Village Design Guidelines

  • Kind: master plan
  • Area as the source states it: Balboa Village and Lido Village (names as listed by the City)
  • Status: Balboa Village Master Plan dated September 25, 2012; Balboa Village Design Guidelines current version October 2014 (City design guidelines page) (October 2014)
  • The City's design guidelines and plans page lists the Balboa Village Master Plan (dated September 25, 2012), the Balboa Village Design Guidelines ("October 2014 (Current Version)") and the Lido Village Design Guidelines. Source: City of Newport Beach, undated (read October 13, 2026).
  • The same page also lists the West Newport Mesa Streetscape Master Plan. Source: City of Newport Beach, undated (read October 13, 2026).

Records: City of Newport Beach (undated (read October 13, 2026)).

Local Coastal Program (certified 2017)

  • Kind: local coastal program
  • Area as the source states it: City of Newport Beach Local Coastal Program (Land Use Plan and Implementing Plan portions)
  • Status: Certified by the Coastal Commission January 13, 2017 (January 13, 2017)
  • A December 2020 Coastal Commission staff report states: "The Coastal Commission certified the City of Newport Beach LCP on January 13, 2017." Source: California Coastal Commission, published 2020-12.
  • The same report describes amendment LCP-5-NPB-19-0151-2 as a "major amendment that would incorporate new provisions and regulations in the LUP and IP". Source: California Coastal Commission, published 2020-12.

Records: California Coastal Commission (published 2020-12).

Capital Improvement Program FY 2026-27 through FY 2031-32

  • Kind: capital improvement program
  • Area as the source states it: City of Newport Beach
  • Status: Proposed CIP document published; adoption by the City Council was on the June 2026 agenda and the outcome is not confirmed from an official source
  • The CIP book covers fiscal years 2026-27 through 2031-32. Source: City of Newport Beach, undated (read October 13, 2026).
  • The City's bulletin of June 5, 2026 states the City Council "will hold the final public hearing and consider adoption of the Fiscal Year 2026-27 budget and Capital Improvement Program". Source: City of Newport Beach (From City Hall to You), published 2026-06-05.

Where sources differ:

  • Two totals, shown as the sources state them and not reconciled here. The CIP book states a total FY 2026-27 CIP budget of $95,096,260 ($49.3M new appropriations plus $45.8M rebudgeted). The City's bulletin of June 5, 2026 states "nearly $48 million for capital improvement projects in the proposed budget".
  • The City's CIP page heading reads "FISCAL YEAR 2025-26 THROUGH 2030-2031", while its link and the CIP book read FY 2026-27 through 2031-32.

Records: City of Newport Beach (undated (read October 13, 2026)); City of Newport Beach (From City Hall to You) (published 2026-06-05); City of Newport Beach (undated (read October 13, 2026)).

How do you read a development tracker without over-reading it?

A filing is not an approval. A filing records that an application was submitted, not that anyone has decided it.

An approval is not a construction start. A Planning Commission or City Council approval, a Notice of Determination or an environmental report each record one step, and the sources here do not say a project broke ground unless they state it.

Dates in this tracker are the source's dates. When a page is undated or lists activity only through a certain day, the entry says so, and nothing is filled in for the months since. Where two sources disagree, as with Snug Harbor Surf Park or the two capital improvement program totals, both are shown with their publishers.

What should you ask about a project near your property?

If you own, lease or are weighing a building near one of these sites, use the entry as a starting list of questions, not a forecast.

  • Ask the City of Newport Beach planning division which approvals the project still needs, and what the status of each one is.
  • Ask what the latest document on the project page is, and its date, before you rely on any timeline.
  • Ask how a construction period could affect access, parking and noise at your address, and whether the environmental report covers it.
  • Compare any lease or purchase price with the status date shown here, since a proposed project can change or stop.
  • Keep your own note of what you were told, by whom and on what date, so a later change can be checked against it.

What does this tracker leave out?

Only projects with a source that was read directly are listed, and residential-only projects are left out. Absence from this page does not mean a project does not exist.

If a project near your property changes your plan, write down the address, the use and your decision date before you ask anyone for a price.

Prepare a note about what you are weighing

Questions people ask

What is the status of the Newport Village project on West Coast Highway?

The City of Newport Beach project page for Newport Village states that a Notice of Preparation of an EIR was sent October 12, 2023. It lists 63,285 square feet of commercial floor area within an approximately 9.4 acre project on West Coast Highway. The page lists the public draft EIR as anticipated for Spring/Summer 2024 and a Planning Commission meeting as late 2024, both estimates, and posts no later activity.

Did the Newport Beach council cancel the Snug Harbor Surf Park?

Not according to the sources recorded here. WavePool Magazine reported on January 29, 2026 that the council rescinded approval of a General Plan Amendment raising the development limit from 20,000 to 59,772 square feet. Its updated text says the wave pool approval still stands. CEQAnet shows a Notice of Determination received October 30, 2025. Check current entitlements with the city.

When could the Balboa Yacht Basin redevelopment be built?

The City of Newport Beach page on the Balboa Yacht Basin states that construction would begin in approximately 2028. It also states the City Council directed staff to continue with the project proposed by Burnham-Ward Properties at 829 Harbor Island Drive. Treat 2028 as the city's published estimate from 2024, not a scheduled start.

Has the Newport Beach medical center project approved in January 2025 opened?

This tracker cannot confirm it. Newport Beach Indy reported unanimous Planning Commission approval in January 2025, and Rebusiness Online reported on April 9, 2025 that completion was slated for spring 2026 with tenant move-ins in summer 2026. No later source is recorded here, so confirm the current status at 3300 Irvine Avenue directly.

What does the Bayside Village Marina project propose?

The City of Newport Beach project page lists marina dock and boat slip extensions for an additional 67 wet slips within the Bayside Village Marina and Back Bay Landing areas. The application was submitted July 18, 2024, and the Notice of Preparation comment period ran October 17, 2025, to November 17, 2025.

How much housing capacity does the Housing Element program study?

CEQAnet, the State Clearinghouse database, lists the Housing Element Implementation Program environmental report as analyzing a total development capacity of 10,087 housing units. The listing is dated June 27, 2023. The source names six focus areas: the Airport Area, West Newport Mesa, Dover-Westcliff, Newport Center, Coyote Canyon and Banning Ranch.

What public infrastructure work is in the works in Newport Beach?

The sources read for this tracker list harbor dredging of the Federal Channels (the City's undated page says USACE began in early December 2025), Balboa Yacht Basin dredging, Balboa Island utility undergrounding district 124, a 15th Street restroom replacement and Police Headquarters site options. A budget line or a meeting is not a construction start, so each entry shows its own status and date.

Which city plans are listed or in preparation in Newport Beach?

The City's General Plan page states the City Council adopted the Newport Beach 2050 General Plan on June 23, 2026, updating the 2006 plan. Planned community texts such as North Newport Center (PC-56) and Koll Center (PC-15) are also listed, and an Airport Area Specific Plan is in preparation. The capital improvement program is listed with two differing budget totals, attributed to their sources.